On July 5th, the City of Raleigh will be closing the Neuse River Greenway at mile marker 14.5, between the trail access at Crag Burn Lane and the Allen Drive parking area, to conduct needed repairs to bridge structure 98.

The Allen Drive parking area will also be closed, on July 2nd, to provide construction material and equipment staging for the projects general contractor.

This map shows the location of the closed section of trail. The expected closure is anticipated to occur from early July 5th 2018 to the end of November 2018, depending on weather conditions and other construction delays.

A designated detour is not provided due to limited street or sidewalk connections available in the vicinity of the bridge repair project. For more information please call 919-996-3285 or go to parks.raleighnc.gov

Original Posting